| PART |
Description |
Maker |
| MAX34451EVKIT |
Easy Evaluation of the MAX34451
|
Maxim Integrated Products
|
| SP6641BEK-L-3-3 |
Easy Evaluation for the SP6641A/6641B Single or Dual Cell Alkaline to 3.3V or 5V Output
|
Exar Corporation
|
| 3006P-1-200 3006P-7-504LF 3006P-1-102 3006P-1-100Z |
Multi-Turn Trimmer Potentiometers 20ohm 3/4" 10% Sealed Multi Turn RESISTOR, TRIMMER, CERMET, 15 TURN(S), 0.75 W, 20 ohm 3006 - Trimpot? Trimming Potentiometer Trimpot Trimming Potentiometer 3006 - Trimpot Trimming Potentiometer
|
Bourns, Inc. Bourns Electronic Solutions
|
| 20215BNRST6 3362R101 3362R203 3362R501 3362R502 33 |
7×7.2 Square/Single Turn/Trimming Potentiometer 7】7.2 Square/Single Turn/Trimming Potentiometer 20 Character by 2 Line Alphanumeric LCD Assembly With COG Controller No internal backlight assembly, must be external
|
http:// DBLECTRO[DB Lectro Inc]
|
| 64R10LF 64R1KLF 64R2KLF 64R50LF 64R5KLF 64R20LF 64 |
1/4 Square Multiturn Cermet Trimming Potentiometer 1 / 4方多转金属陶瓷微调电位器 1/4 Square Multiturn Cermet Trimming Potentiometer RESISTOR, TRIMMER, CERMET, 12 TURN(S), 0.25 W, 1000000 ohm
|
BI Technologies Corporation BI Technologies, Corp.
|
| LTC2480 LTC2480CDD LTC2480IDD |
16-Bit ADC with Easy Drive 16-Bit Delta Sigma ADC with Easy Drive Input Current Cancellation
|
LINER[Linear Technology]
|
| 3329S 3329S254 3329S201 3329S203 3329S202 3329S205 |
6.8B>4.7 Circularity/ Single Turn /Trimming Potentiometer 6.8.7 Circularity/ Single Turn /Trimming Potentiometer 6.8.7单转/微调电位 6.8??.7 Circularity/ Single Turn /Trimming Potentiometer
|
DB Lectro Inc. DB Lectro, Inc.
|
| PECLDL-10-1 PECLDL-10-4 PECLDL-10-7 PECLDL-10-9 PE |
LTC3824 Evaluation Kit LT3844EFE Evaluation Kit LT3476EUHF Evaluation Kit LTC3835EGN-1 Evaluation Kit 延迟线|可编程| 1线| 1 -技术咨询|混合|双酯| 32脚|塑料 DELAY LINE|PROGRAMMABLE|1-LINE|1-TAP|HYBRID|DIP|32PIN|PLASTIC 延迟线|可编程| 1线| 1 -技术咨询|混合|双酯| 32脚|塑料
|
Advanced Power Electronics, Corp.
|
| MAX6901EVSYS MAX6902EVKIT MAX6901EVKIT |
Evaluation System/Evaluation Kit for the MAX6901 Evaluation System/Evaluation Kit for the MAX6902
|
MAXIM - Dallas Semiconductor
|