| PART |
Description |
Maker |
| RPM-3.0-EVM-1 |
Easy evaluation of trimming, sequencing, soft start, enable and sensing functions
|
Recom International Pow...
|
| SP6641BEK-L-3-3 |
Easy Evaluation for the SP6641A/6641B Single or Dual Cell Alkaline to 3.3V or 5V Output
|
Exar Corporation
|
| 5962-8757902XC 5962-8757901YX 5962-8757901XX 5962- |
Evaluation Kit for the MAX9713 500mW, Low EMI, Filterless, Class D Audio Amplifier Evaluation Kit for the MAX9710 Evaluation Kit for the MAX9716 Low-Cost, Mono/Stereo, 1.4W Differential Audio Power Amplifiers Evaluation Kit for the MAX9715 Evaluation Kit for the MAX9704, MAX9714 Evaluation Kit/Evaluation System for the MAX9851 Transceiver 收发 Low-Cost, Mono, 1.4W BTL Audio Power Amplifiers 收发
|
Air Cost Control Vishay Intertechnology, Inc.
|
| 3314J-1-500E 3314J-1-101E 3314J-1-102E 3314J-1-201 |
3314 - 4 mm Square Trimpot? Trimming Potentiometer Square Trimpot Trimming Potentiometer J-hook, gull-wing and pinned configurations 3314 - 4 mm Square Trimpot Trimming Potentiometer
|
Bourns Electronic Solutions
|
| MAX1583XETB MAX1583YETB MAX1583ZETB MAX1583EVKIT M |
White LED Camera-Flash MAX1583 Evaluation Kit 1 A, 24 V, evaluation kit 500 mA, 24 V, evaluation kit 250 mA, 24 V, evaluation kit
|
MAXIM - Dallas Semiconductor
|
| EV42-160-22-SERIES EV44-100-22-SERIES EV44-160-22- |
TLC2555 Evaluation Module TLC4545 Evaluation Module TLC2551 Evaluation Module CC1000DK-868/915 MHz Development Kit CC2400DK Development Kit TPA0172 Evaluation Module Radiomodem 433 MHz CC2400DBK Demonstration Board Kit CC1000PP 433 MHz Plug and Play Module Digital Data Capture and Analysis for High Speed, High Resolution A to D Converters ADS1244 Evaluation Module SN65HVD22EVM Evaluation Module Peripheral IC 外围芯片
|
Infineon Technologies AG NXP Semiconductors N.V. Amphenol, Corp. Xicon Passive Components Electronic Theatre Controls, Inc.
|
| 2683-100410 2683-200240 2683-200410 2683-100240 26 |
Quadruple-Mode LNA/Mixer Evaluation Kits MAX2582 Evaluation Kit Evaluation Kit for the MAX2601, MAX2602 Interface IC Quad-Band TDD-WCDMA RF-to-Bits Radio Receiver 接口IC
|
Teledyne Technologies, Inc.
|
| 20215BNRST6 3362R101 3362R203 3362R501 3362R502 33 |
7×7.2 Square/Single Turn/Trimming Potentiometer 7】7.2 Square/Single Turn/Trimming Potentiometer 20 Character by 2 Line Alphanumeric LCD Assembly With COG Controller No internal backlight assembly, must be external
|
http:// DBLECTRO[DB Lectro Inc]
|
| PECLDL-10-1 PECLDL-10-4 PECLDL-10-7 PECLDL-10-9 PE |
LTC3824 Evaluation Kit LT3844EFE Evaluation Kit LT3476EUHF Evaluation Kit LTC3835EGN-1 Evaluation Kit 延迟线|可编程| 1线| 1 -技术咨询|混合|双酯| 32脚|塑料 DELAY LINE|PROGRAMMABLE|1-LINE|1-TAP|HYBRID|DIP|32PIN|PLASTIC 延迟线|可编程| 1线| 1 -技术咨询|混合|双酯| 32脚|塑料
|
Advanced Power Electronics, Corp.
|
| 28C16A-20E/K 28C16A-20E/J 28C16A-20E/L 28C16A-15E/ |
Evaluation Kit for the MAX5092B, MAX5092A, MAX5093B, MAX5093A Evaluation Kit for the MAX5090 Evaluation Kit for the MAX5080, MAX5081, MAX5082, MAX5083 128Kx8 EEPROM 128Kx8 EEPROM
|
Microchip Technology, Inc.
|
| MAX1231EVC16 MAX1231EVKIT |
Evaluation Kit/Evaluation System for the MAX1030/MAX1031/MAX1230/MAX1231
|
MAXIM - Dallas Semiconductor
|