| PART |
Description |
Maker |
| AAT3670ISK-4.2-T1 AAT3670 |
1.6A Dynamic Battery Charger and Power Manager The AAT3670 BatteryManager is a highly integrated single-cell lithium-ion/polymer (Li-ion) battery c
|
Analogic Corporation ANALOGICTECH[Advanced Analogic Technologies]
|
| AT49BV-LV002 AT49BV002-90VI ATMELCORP.-AT49BV-LV00 |
2-Megabit (256K x 8) Single 2.7-volt Battery-VoltageFlash Memory 2兆位56K × 8)单2.7伏电池电压⑩闪存 x8 Flash EEPROM 2-Megabit (256K x 8) Single 2.7-volt Battery-Voltage Flash Memory
|
Atmel, Corp. Atmel Corp. ATMEL Corporation
|
| AT49BV-LV002 AT49LV002T AT49BV002 AT49BV002N AT49B |
2-MEGABIT (256K X 8) SINGLE 2.7-VOLT BATTERY-VOLTAGE⒙ FLASH MEMORY 2-Megabit (256K x 8) Single 2.7-volt Battery-Voltage⑩ Flash Memory
|
ATMEL[ATMEL Corporation]
|
| EM9201 |
World隆炉s First Fully Integrated Single-Cell Battery 2.4 GHz Transceiver World’s First Fully Integrated Single-Cell Battery 2.4 GHz Transceiver
|
EM Microelectronic - MARIN SA
|
| 7009-220 7009-240 3.12.5-220 7010-115 7010-100 3.1 |
10-Port I/O Expander with LED Intensity Control, Interrupt, and Hot-Insertion Protection Low-Power, Single-/Dual-Level Battery Monitors with Hysteresis and Integrated µP Reset Analog IC 模拟IC 8th-Order, Lowpass, Elliptic, Switched-Capacitor Filters 模拟IC Low-Power, Single-/Dual-Level Battery Monitors with Hysteresis and Integrated µP Reset
|
Ecliptek, Corp. Bourns, Inc. Lumex, Inc. SCHURTER AG Bel Fuse, Inc. Maxim Integrated Products, Inc.
|
| ADP3820 ADP3820AR-41 ADP3820AR-42 ADP3820ART-41 AD |
20V; lithium-ion battery changer. For Li-Ion battery chargers, desktop computers, hand-held instruments Circular Connector; No. of Contacts:17; Series:; Body Material:Aluminum Alloy; Connecting Termination:Solder; Connector Shell Size:20; Circular Contact Gender:Socket; Circular Shell Style:Cable Receptacle; Insert Arrangement:20-29 RoHS Compliant: No Circular Connector Cable Assembly; Connector Type A:Circular Receptacle; Connector Type B:Stripped End Leads; Cable Length:10ft RoHS Compliant: Yes Lithium-Ion Battery Charger ±1% Precision, Single Cell Li-Ion Battery Charger
|
Analog Devices, Inc. AD[Analog Devices]
|
| 2244 3080-1B 3500-10B 3610-12B 3320-8B 3180-3B |
BIN BOX STACKABLE Low-Power, Single-/Dual-Level Battery Monitors with Hysteresis and Integrated µP Reset Microprocessor Supervisory Reset Circuits with Edge-Triggered, One-Shot Manual Reset Low-Power, Single-/Dual-Level Battery Monitors with Hysteresis and Integrated µP Reset 过境 TRANSIT BOX 过境
|
YEONHO Electronics Co., Ltd.
|
| 2SK3025 2SK3025TENTATIVE |
Low-Power, Single-/Dual-Level Battery Monitors with Hysteresis and Integrated µP Reset Silicon N-Channel Power F-MOS FET Low-Power, Single-/Dual-Level Battery Monitors with Hysteresis and Integrated µP Reset
|
PANASONIC[Panasonic Semiconductor] Panasonic Corporation
|
| PB-360-48 PB-360-12 PB-360-24 PB-36010 |
360W Single Output Battery Charger
|
http://
|
| WS4508S |
1000mA, Single Li-ion Battery Charger
|
TY Semiconductor Co., L...
|
| BH-03-3 BH-08-3 BH-01-3 BH-05-3 |
BATTERY HOLDERS AA SINGLE & MULTIPLE CELLS
|
Adam Technologies, Inc. http://
|