| PART |
Description |
Maker |
| MPM3606AGQV |
21V/0.6A DC/DC Module Synchronous Step-Down Converter with Integrated Inductor
|
MPS Industries, Inc.
|
| RT7264A |
4A, 21V, 500kHz Synchronous Step-Down Converter
|
Richtek Technology Corporation
|
| RT7262A |
2A, 21V 500kHz Synchronous Step-Down Converter
|
Richtek Technology Corporation
|
| RT8288A RT8288AZSP C3225X5R1C226M GRM32ER71C226M |
4A, 21V 500kHz Synchronous Step-Down Converter
|
Richtek Technology Corporation Richtek Technology Corporat... Richtek Technology Corp...
|
| RT7263B |
3A, 21V 500kHz Synchronous Step-Down Converter
|
Richtek Technology Corporation
|
| MP28367 MP28367DJ |
1A, 21V, 1.4MHz Step-Down Converter in a TSOT23-6
|
Monolithic Power Systems
|
| MP38872 MP38872DL |
6A, 21V, 600kHz Step-Down Converter with Synchronizable Gate Driver
|
Monolithic Power System...
|
| MP8709EN |
High Efficiency 4A, 21V, 500kHz Synchronous Step-down Converter
|
Monolithic Power Systems
|
| IRG4BC30KPBF |
INSULATED GATE BIPOLAR TRANSISTOR(Vces=600V, Vce(on)typ.=2.21V, @Vge=15V, Ic=16A) 绝缘栅双极晶体管(VCES和\u003d 600V电压的Vce(on)典\u003d 2.21V,@和VGE \u003d 15V的,集成电路\u003d 16A条)
|
International Rectifier, Corp.
|
| IR3448M-15 |
Single 5V to 21V application
|
International Rectifier
|
| DC/DCTMV-1212S DC/DCTMV-1205S DC/DCTMV-2405D DC/DC |
DC/DC Converter 1Watt(41.50 k) 直流/直流转换瓦(41.50十一 DC/DC Converter 2-OUTPUT DC-DC REG PWR SUPPLY MODULE
|
TRACO ELECTRONIC AG
|
| IS31LT3135-V1GRLS2-TR |
LED Lighting Drivers Main/sub dual-Ch LED Drvr 1.13V-1.21V
|
Integrated Silicon Solution, Inc.
|