| PART |
Description |
Maker |
| 7720-1-EVM 7720-2A 7720-1A 7720-3A 7700-2A |
PFC DESIGN TIPS & TECHNIQUES
|
Bi technologies
|
| DPS-150AB-15 |
Active PFC design, which can improve the performance on ripple noise and also be benefit for saving energy.
|
Delta Electronics, Inc.
|
| FPAB30BH60B |
PFC SPM 3 Series for Single-Phase Boost PFC
|
ON Semiconductor
|
| FPDB60PH60B |
PFC SPM3 Series Ver.2 for 2-Phase Bridgeless PFC
|
Fairchild Semiconductor
|
| 5676A |
Test Probe Set with Replaceable Tips
|
Pomona Electronics
|
| CWH-CTP-COP-YE |
Power Architecture processor ( COP ) Probe Tips for CodeWarrior TAP
|
Freescale Semiconductor, Inc
|
| IR2166 IR2166S IR2166SPBF |
PFC & BALLAST CONTROL IC PFC Ballast Control in a 16-lead SOIC Narrow package PFC Ballast Control in a 16-pin DIP package
|
International Rectifier
|
| AN165 |
EMI REDUCTION TECHNIQUES
|
Crystal
|
| AN165 |
EMI REDUCTION TECHNIQUES
|
List of Unclassifed Manufacturers ETC[ETC]
|
| LOPAC PM5-100200 PM5-150400 PM5-200400 PM5-75200 P |
OutputV:3.3Vdc; inputV:85-264V; 50W; LoPAC family: PFC mini power factor corrected, AC-DC switcher OutputV:3.3Vdc; inputV:85-264V; 99W; LoPAC family: PFC mini power factor corrected, AC-DC switcher OutputV:3.3Vdc; inputV:85-264V; 66W; LoPAC family: PFC mini power factor corrected, AC-DC switcher OutputV:3.3Vdc; inputV:85-264V; 132W; LoPAC family: PFC mini power factor corrected, AC-DC switcher OutputV:5Vdc; inputV:85-264V; 200W; LoPAC family: PFC mini power factor corrected, AC-DC switcher OutputV:5Vdc; inputV:85-264V; 100W; LoPAC family: PFC mini power factor corrected, AC-DC switcher PFC Mini, PFC Micro, PFC MicroS Power Factor Corrected, AC-DC Switchers PFC Mini/ PFC Micro/ PFC MicroS Power Factor Corrected/ AC-DC Switchers OutputV:5Vdc; inputV:85-264V; 150W; LoPAC family: PFC mini power factor corrected, AC-DC switcher OutputV:5Vdc; inputV:85-264V; 75W; LoPAC family: PFC mini power factor corrected, AC-DC switcher
|
Vicor Corporation
|
| AN13 |
High Speed Comparator Techniques
|
Linear Technology
|