| PART |
Description |
Maker |
| DEM2812C DEM2815C DEM2810C DEM2818C 1226AS-H-120M |
Low profile (2.8 x 3.0mm square, 1.0/1.2/1.5/1.8mm
|
TOKO, Inc
|
| SMQ250RTP SMQ250YTP SMQ250ATP SMQ250GTP SMQ250BTP |
PROFILE FRESNEL LENS 3MM SQUARE LOW
|
Visual Communications C...
|
| EVM-2NSX80B15 EVM-2NSX80B55 EVM-2NSX80B53 EVM2G |
2 mm Square Low-Profi le SMT Trimmer Potentiometers (Cermet, Open Frame Type)
|
Panasonic Semiconductor
|
| EVM2NSX80B52 EVM2T EVM2W |
2 mm Square Low-Profi le SMT Trimmer Potentiometers (Cermet, Open Frame Type)
|
Panasonic Semiconductor
|
| 43743-6001 0437436001 |
Modular Jack, Right Angle, Low Profile, SMT, 6/6
|
Molex Electronics Ltd.
|
| SD-44144-001 0441440003 44144-0003 |
Modular Jack, Right Angle, Low Profile, SMT, 8/8
|
Molex Electronics Ltd.
|
| 0437436201 43743-6201 |
Modular Jack, Right Angle, Low Profile, SMT, 6/2
|
Molex Electronics Ltd.
|
| EPA3490G |
Interface Low Profile SMT Dual Transformer
|
PCA[PCA ELECTRONICS INC.]
|
| 44282-0004 |
Modular Jack, Right Angle, Low Profile, Shielded, SMT, 8/8
|
Molex Electronics Ltd.
|
| 51146-0500 51146-0400 51146-0600 50753-8141 51146- |
Ultra Low Profile SMT Right Angle Header and Receptacle
|
MolexKits
|
| T-18300 T-18301 T-18302 T-18303 T-18305 T-18304 |
ISDN S-Interface Low Profile SMT Dual Transformers
|
Rhombus Industries Inc.
|
| 85542-5001 0855425001 |
Modular Jack, Right Angle, Low Profile, Shielded, SMT, 8/8
|
Molex Electronics Ltd.
|