| PART |
Description |
Maker |
| ALD1116DA ALD1106SB ALD1106DB ALD1106 ALD1106PB AL |
QUAD/DUAL N-CHANNEL MATCHED PAIR MOSFET ARRAY Contact Gender:Pin; Circular Shell Style:Straight Plug; Insert Arrangement:22-35 RoHS Compliant: No TRANS NPN 40VCEO 10A TO-220F 双N沟道MOSFET的阵列匹 QUAD/DUAL N-CHANNEL MATCHED MOSFET ARRAY 双N沟道MOSFET的阵列匹
|
ALD[Advanced Linear Devices] Advanced Linear Devices, Inc.
|
| EVM4717DBG EDGE4717D |
Quad Channel, Per Pin Precision Measurement Unit
|
Semtech Corporation
|
| OCP-PCT4116E |
SIXTEEN PIN DIP QUAD CHANNEL PHOTOCOUPLER
|
LUMEX INC.
|
| IRHQ9110SCS |
100V Quad P-Channel MOSFET in a 28-pin LCC package
|
International Rectifier
|
| MAX463 MAX463CNG MAX463CWG MAX463ENG MAX463EWG MAX |
Two-Channel Triple/Quad RGB Video Switches and Buffers Two-Channel / Triple/Quad RGB Video Switches and Buffers CONNECTOR ACCESSORY 2W Stereo APA With Digital Volume Control 24-HTSSOP -40 to 85 4-CHANNEL, FOUR POLE DOUBLE THROW SWITCH, PDIP28 Two-Channel, Triple/Quad RGB Video Switches and Buffers QUAD BUFFER AMPLIFIER, PDSO16
|
MAXIM - Dallas Semiconductor MAXIM[Maxim Integrated Products] Maxim Integrated Products, Inc. Fujitsu, Ltd.
|
| IRHQ58110N |
100V 1000kRad Hi-Rel Quad N -Channel TID Hardened MOSFET in a 28-pin LCC package
|
International Rectifier
|
| ADG1633 ADG1633BCPZ-REEL7 ADG1633BRUZ ADG1633BRUZ- |
4.5Ω RON, Triple/Quad SPDT ±5 V, 12 V, 5 V, and 3.3 V Switches; Package: 16-pin; Temperature Range: -40°C to 125°C TRIPLE 1-CHANNEL, SGL POLE DOUBLE THROW SWITCH, PDSO16 4.5Ω RON, Triple/Quad SPDT ±5 V, 12 V, 5 V, and 3.3 V Switches; Package: 20-TSSOP (4.4mm); Temperature Range: -40°C to 125°C QUAD 1-CHANNEL, SGL POLE DOUBLE THROW SWITCH, PDSO20 4.5 Ω RON, Triple/Quad SPDT ±5 V, 12 V, 5 V, and 3.3 V Switches 4.5 楼? RON, Triple/Quad SPDT 隆戮5 V, 12 V, 5 V, and 3.3 V Switches
|
Analog Devices, Inc.
|
| MC14519BCL MC14519BCP MC14519BD ON0905 MC14519B |
4-Bit AND/OR Selector or Quad 2-Channel Data Selector or Quad Exclusive NOR Gate 4000/14000/40000 SERIES, QUAD 2-INPUT XNOR GATE, CDIP16 From old datasheet system
|
Maxim Integrated Products, Inc. MOTOROLA[Motorola, Inc]
|
| MC14551BFELG |
Quad 2-Channel Analog Multiplexer/Demultiplexer; Package: SOEIAJ-16; No of Pins: 16; Container: Tape and Reel; Qty per Container: 2000 QUAD 2-CHANNEL, SGL ENDED MULTIPLEXER, PDSO16
|
Rectron Semiconductor
|
| DG451EY-T1-E3 DG452EY-T1-E3 DG453EQ-T1-E3 |
Analog Switch Quad SPST 16-Pin SOIC N T/R IC SWITCH QUAD SPST 16SOIC IC SWITCH QUAD SPST 16TSSOP
|
Vishay Siliconix
|
| ADG201A ADG201ABQ ADG201AKN ADG201AKP ADG201AKR AD |
Circular Connector; MIL SPEC:MIL-DTL-38999 Series I; Body Material:Metal; Series:LJT; No. of Contacts:6; Connector Shell Size:17; Connecting Termination:Crimp; Circular Shell Style:Straight Plug; Body Style:Straight RoHS Compliant: No 60 Ohm, Quad SPST Switch (Normally Closed Switches, DG201A replacement) Contact Gender:Pin; Circular Shell Style:Straight Plug; Insert Arrangement:23-35 Contact Gender:Socket; Circular Shell Style:Straight Plug; Insert Arrangement:23-35 LJT 100C 100#22M PIN PLUG Circular Connector; No. of Contacts:11; Series:LJT06R; Body Material:Aluminum; Connecting Termination:Crimp; Connector Shell Size:19; Circular Contact Gender:Pin; Circular Shell Style:Straight Plug; Insert Arrangement:19-11 SPST Analog Switch 1-CHANNEL, SGL POLE SGL THROW SWITCH, CQCC20 LCMOS Quad SPST Switches LC MOS Quad SPST Swithches LC2MOS Quad SPST Switches
|
AD[Analog Devices] Analog Devices, Inc. ANALOG DEVICES INC
|