| PART |
Description |
Maker |
| EDGE692 E692AHJ EVM692AHJ E692-EDGE692 |
200 MHz Monolithic Dual Pin Electronics Driver 200 MHz Monolithic Dual Pin Electronics Driver 200兆赫单片双引脚电子驱动器
|
SEMTECH[Semtech Corporation] Semtech, Corp.
|
| ISL55100AEVAL3Z |
Quad 18V Pin Electronics Driver/Window Comparator
|
Intersil Corporation
|
| EVM649EVM E649BPJ EDGE649 E649 |
Low Power 5V RS232 Dual Driver/Receiver with 0.1?碌F Capacitors; Package: SO; No of Pins: 16; Temperature Range: -40?掳C to 85?掳C Low Power 5V RS232 Dual Driver/Receiver with 0.1?μF Capacitors; Package: SO; No of Pins: 16; Temperature Range: -40?°C to 85?°C Octal Pin Electronics Driver/Receiver
|
SEMTECH[Semtech Corporation]
|
| MAX9979KCTKB4N |
Dual 1.1Gbps Pin Electronics with Integrated PMU and Level-Setting DACs
|
MAXIM - Dallas Semiconductor
|
| ISL55162 |
SOC Dual Channel 300MHz Pin Electronics/DAC/PMU/Deskew
|
Intersil Corporation
|
| 0010883141 10-88-3141 A-70216-0084 |
2.54mm (.100) Pitch C-Grid? Breakaway Header, High Profile, Dual Row, Right Angle,14 Circuits, 6.10mm (.240) Mating Pin Length, Tin (Sn) Plating Molex Electronics Ltd.
|
Molex Electronics Ltd.
|
| AD53032 AD53032JSTP |
Silver Mica Capacitor; Capacitance:12pF; Capacitance Tolerance: /- 5%; Series:CD17; Voltage Rating:500VDC; Capacitor Dielectric Material:Mica; Termination:Radial Leaded; Lead Pitch:5.9mm; Leaded Process Compatible:Yes RoHS Compliant: Yes High Performance Driver/Comparator Active Load on a Single Chip DRIVER/COMPARATOR/LOAD: A Single Chip that Performs the Pin Electronics Functions of Driver, Comparator and Active Load in ATE VLSI and Memory Testers
|
Analog Devices, Inc. AD[Analog Devices]
|
| 74AC240MTC 74AC240PC 74AC240SC 74AC240SJ 74ACT240M |
Low-Power µP Reset Circuits in 3-Pin SC70/SOT23 Octal Buffer/Line Driver with 3-STATE Outputs AC SERIES, DUAL 4-BIT DRIVER, INVERTED OUTPUT, PDSO20 From old datasheet system
|
FAIRCHILD SEMICONDUCTOR CORP Fairchild Semiconductor, Corp. FAIRCHILD[Fairchild Semiconductor]
|
| IR4427 IR4427PBF IR4427S IR4427SPBF IR4428 IR4428P |
DUAL LOW SIDE DRIVER Dual Low Side Driver, Inverting Input in a 8-pin DIP package Dual Low Side Driver, Inverting Input in a 8-lead SOIC package Dual Low Side Driver in a 8-pin DIP package Dual Low Side Driver in a 8-lead SOIC package Dual Low Side Driver, Half Inverting Input in a 8-pin DIP package Dual Low Side Driver, Half Inverting Input in a 8-lead SOIC package
|
IRF[International Rectifier]
|
| PIC18F86J72-I_PT PIC18F87J72-I_PT |
80-Pin, High-Performance Microcontrollers with Dual Channel AFE, LCD Driver and nanoWatt Technology
|
Microchip Technology
|
| ADP3624ARDZ ADP3624ARDZ-RL ADP3624ARHZ ADP3633 ADP |
High Speed, Dual, 4 A MOSFET Driver, Dual Inverting with Thermal Protection; Package: 8-pin; Temperature Range: -40°C to 125°C 4 A 2 CHANNEL, BUF OR INV BASED MOSFET DRIVER, PDSO8 High Speed, Dual, 4 A MOSFET Driver with One Channel Inverting, One Channel Non-Inverting with Thermal Protection; Package: 8-pin; Temperature Range: -40°C to 125°C 4 A 2 CHANNEL, BUF OR INV BASED MOSFET DRIVER, PDSO8 High Speed, Dual, 4 A MOSFET Driver with Thermal Protection
|
Analog Devices, Inc.
|