| PART |
Description |
Maker |
| DM74157 DM74157N |
Quad 2-line 1-line data selecors/multiplexer TTL/H/L SERIES, QUAD 2 LINE TO 1 LINE MULTIPLEXER, TRUE OUTPUT, PDIP16 11.3 Gbps Differential VCSEL Driver 20-QFN Quad 2-Line to 1-Line Data Selectors/Multiplexer
|
Fairchild Semiconductor, Corp. Fairchild Semiconductor Corporation FAIRCHILD[Fairchild Semiconductor]
|
| DS21448 DS21448L DS21448LN DS21448N |
3.3V E1/T1/J1 Quad Line Interface
|
DALLAS[Dallas Semiconductor] Dallas Semiconducotr
|
| OX16PCI954-TQA1G OX16PCI954-TQC60-A1 OX16PCI95405 |
Integrated Quad UART and PCI interface
|
OXFORD[Oxford Semiconductor]
|
| OX16PCI954-TQC60-A |
Integrated Quad UART and PCI interface
|
Electronic Theatre Controls, Inc.
|
| CS61577-IP1 CS61577-IL1 CDB615305A CDB61534 CDB615 |
T1/E1 LINE INTERFACE T1/E1线路接口 T1/E1 LINE INTERFACE 的T1/E1线路接口 T1/E1 LINE INTERFACE DATACOM, PCM TRANSCEIVER, PDIP28 T1/E1 LINE INTERFACE
|
http:// List of Unclassifed Manufacturers Cirrus Logic, Inc. Electronic Theatre Controls, Inc.
|
| DS21348 DS21348G DS21348GN DS21348T DS21348TN DS21 |
3.3V E1/T1/J1 Line Interface Single/Quad
|
DALLAS[Dallas Semiconductor] DALLAS[Dallas Semiconducotr] Maxim
|
| PM4314 PM4314-RI |
QUAD T1/E1 LINE INTERFACE DEVICE
|
PMC-Sierra, Inc
|
| PM4314 PM4314-RI |
QUAD T1/E1 LINE INTERFACE DEVICE DATACOM, PCM TRANSCEIVER, PQFP128
|
PMC-Sierra, Inc.
|
| IDT82V1671 IDT82V1671J |
CHIPSET OF RINGING SUBSCRIBER LINE INTERFACE CIRCUIT (RSLIC) & QUAD PROGRAMMABLE PCM CODEC
|
Integrated Device Technology IDT
|
| DM74ALS257MX DM74ALS257MXNL |
3-STATE Quad 1-of-2 Line Data Selector/Multiplexer; Package: SOIC; No of Pins: 16; Container: Tape & Reel ALS SERIES, QUAD 2 LINE TO 1 LINE MULTIPLEXER, TRUE OUTPUT, PDSO16 3-STATE Quad 1-of-2 Line Data Selector/Multiplexer ALS SERIES, QUAD 2 LINE TO 1 LINE MULTIPLEXER, TRUE OUTPUT, PDSO16
|
Fairchild Semiconductor, Corp.
|
| HCS157MS HCS157D HCS157DMSR HCS157HMSR HCS157K HCS |
Multiplexer, Digital, 2-Input, Quad, Rad-Hard, High-Speed, CMOS, Logic From old datasheet system Radiation Hardened Quad 2-Input Multiplexers HC/UH SERIES, QUAD 2 LINE TO 1 LINE MULTIPLEXER, TRUE OUTPUT, CDIP16
|
INTERSIL[Intersil Corporation] Intersil, Corp.
|