| PART |
Description |
Maker |
| MAPD-007249-ESML21 |
5 MHz - 500 MHz RF/MICROWAVE SPLITTER, 1 dB INSERTION LOSS ROHS COMPLIANT, SM-24, 6 PIN E-Series 2-Way 0Power Divider 5 - 500 MHz
|
Mini-Circuits Tyco Electronics
|
| E211ATF |
Dual Pin Electronics Driver
|
Semtech Corporation
|
| EVM211ATF EDGE211 |
Dual Pin Electronics Driver
|
Semtech Corporation
|
| ADL5534-EVALZ ADL5534ACPZ-WP |
20 MHz to 500 MHz IF Gain Block 20 MHz00 MHz的中频增益模 20 MHz to 500 MHz IF Gain Block 20 MHz - 500 MHz RF/MICROWAVE NARROW BAND MEDIUM POWER AMPLIFIER
|
Analog Devices, Inc.
|
| EVM818AHF E818AHF EDGE818 |
Octal 18V Pin Electronics Driver/window Comparator
|
SEMTECH[Semtech Corporation]
|
| EVM646ATF E646 EDGE646 E646ATF |
Pin Electronics Driver, Window Comparator, and Switch Matrix Pin Electronics Driver/ Window Comparator/ and Switch Matrix
|
SEMTECH[Semtech Corporation]
|
| OP-249AJ/883 OP-249ARC/883 OP-249AZ/883 |
DUAL OP-AMP, 500 uV OFFSET-MAX, 4.7 MHz BAND WIDTH, MBCY8 METAL CAN, TO-99, 8 PIN DUAL OP-AMP, 500 uV OFFSET-MAX, 4.7 MHz BAND WIDTH, CQCC20 HERMETIC SEALED, CERAMIC, LCC-20 DUAL OP-AMP, 500 uV OFFSET-MAX, 4.7 MHz BAND WIDTH, CDIP8 CERDIP-8
|
Analog Devices, Inc.
|
| MRF275G |
150 W, 28 V, 500 MHz N.CHANNEL MOS BROADBAND 100 - 500 MHz RF POWER F
|
MOTOROLA
|
| PC8116GR UPC8116GR |
500 MHz, AM/ASK RECEIVER IC(500 MHz AM/ASK受发器芯 SPECIALTY TELECOM CIRCUIT, PDSO20
|
NEC Corp.
|
| MAAMSS00014SMB-01 MAAMSS00014SMB-02 |
Broadband Driver Amplifier 500 - 2400 MHz
|
M/A-COM Technology Solutions, Inc.
|
| ZHL-5W-1 |
50High Power 5 to 500 MHz 5 MHz - 500 MHz RF/MICROWAVE WIDE BAND HIGH POWER AMPLIFIER
|
Mini-Circuits
|
| EVM646ATF |
Pin Electronics Driver, Window Comparator, and Switch Matrix
|
Semtech Corporation
|